Project

Arts Depot (Tally Ho)

Delivering a purpose-built venue for a thriving local theatre

The Arts Depot project is one of the most complex building structures of it’s time, with a major challenge being the intertwining of a rich mix of uses into an island site constrained on three sides by a dual carriageway.

A two-storey basement allowed the use of raft foundation to save on costs and to avoid piling too close to the low-level sewer running across the site. The soil conditions along with the undulating heights of the building meant that the excavation and construction sequence were crucial in controlling the raft movements. Walsh worked with the main contractor and geotechnical engineer to accurately model movements at each stage. Walsh were employed after planning permission was granted, at which stage the layouts of the competing uses and building heights were fixed.

The open spaces of the bus depot severely limited the number and positions of supporting columns. As a result, we used concrete deep beams, trusses and deep plate girders to achieve the required spans with minimal impact on architectural layouts and building height.

The 400-seat auditorium, featuring a proscenium arch, orchestra pit and raked stall seating, was all supported on six individual columns, whilst there is a smaller 150-seat theatre sits alongside it.

Client 
  • Barnet B.C.
  • Chiltern Investments
  • Wilcon Homes
Architect 
  • Ruddle Wilkinson
Contractor 
  • MJ Gleeson
Completion Date2004
Specialisms 
Location 
  • Barnet
  • London

Please click on images below to open a full-screen gallery.

Explore Related Projects

Mixed Use

101 Camley Street

Tailoring a new-build for commercial, life sciences fit-out [...]

Read more

Commercial

127 Charing Cross Road

Extra storeys and a remodel whilst nightclub remained operational on ground floor [...]

Read more

Historical Buildings

38 King Street

Delivering modern retail space in a Grade II listed building [...]

Read more

Mixed Use

61 Oxford Street

Winner of the RIBA London Region Award and RIBA National Award 2016 [...]

Read more

Retail

80 Oxford Street

Complex temporary works on extremely confined site [...]

Read more

Residential

9 Millbank

Reuse and renovation strategy significantly reduces cost, carbon & programme [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.