Specialism

Temporary Works

Temporary Works

Some Example Projects

Residential

Paddington Green Police Station

Wind-tunnel testing and temporary works design reduces high-rise concrete volumes & embodied carbon [...]

Read more

Mixed Use

Harold Hill Family Welcome Centre

Structural scheme designed for future-proof adaptation [...]

Read more

Student Accommodation

urbanest Battersea Palmerston Court

Exemplar PBSA development incorporating MMC innovations and PassivHaus standards [...]

Read more

Build to Rent (BTR & PRS)

Coppermaker Square

Maximising value across multiple areas through lean value engineering [...]

Read more

Residential

Camden Goods Yard

Basement optimisation saved Ā£2m and increases parking bays with NWR & TW constraints [...]

Read more

Build to Rent (BTR & PRS)

The Crown Works

Value engineering approach provides surety and sustainability on BTR scheme [...]

Read more

Commercial

Clarendon Centre

Regeneration and repurposing of an urban shopping centre [...]

Read more

Mixed Use

Millharbour Village

Minimised build cost through rationalisation [...]

Read more

Mixed Use

Arts Depot (Tally Ho)

Delivering a purpose-built venue for a thriving local theatre [...]

Read more

Education

London Dock School

Cost-effective Passivhaus school facilities focused on minimising Whole Life Carbon [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.