Project

Chapter London Bridge

Innovating city student living through MMC

Chapter London Bridge is a 40-storey private student residential tower situated in a prime location next to London Bridge Station. The structure is unique for its innovative Modern Methods of Construction (MMC) approach, utilising entirely precast elements.

Walsh led the High Rise Solution (HRS) segment of the structure, designing all the precast concrete elements within a tight design programme. The structure, along with the faƧade, has been prefabricated off-site, predominantly at two locations in East Anglia. This approach ensures superior quality control and expedites on-site construction, with a turnaround of one floor, including faƧade, every five days.

Constructing in a constrained urban environment presents distinct challenges which MMC lends itself to. The site is bounded by public roads on three sides, with an active building site on another, and London Bridge Station nearby. With no storage space on-site, precasting reduced wetworks. Elements can be lifted directly from transport lorry into place, which results in significant time and cost savings for the client.

Walsh rationalised the structure to suit this method of construction, resulting in consistent floorplates that lends itself well to MMC. The innovative Ynomia tracking system also allowed us to monitor stage-by-stage progress of the elements from setting up formwork in the precasting facility through to onsite installation.

Client 
  • Mace
Architect 
  • KPF
Contractor 
  • Kelly Formwork
Completion Date2025
Location 
  • London
  • Southwark

Please click on images below to open a full-screen gallery.

Explore Related Projects

Residential

Synergy, Victoria Way

Read more

Student Accommodation

Wembley Park Plot NE01

Using lean design to reduce embodied carbon on large PBSA scheme [...]

Read more

Residential

83 Barchester Street

Revitalising a site of industrial heritage for modern living and community-focused design [...]

Read more

Residential

Paddington Green Police Station

Wind-tunnel testing and temporary works design reduces high-rise concrete volumes & embodied carbon [...]

Read more

Mixed Use

Harold Hill Family Welcome Centre

Structural scheme designed for future-proof adaptation [...]

Read more

Student Accommodation

urbanest Battersea Palmerston Court

Exemplar PBSA development incorporating MMC innovations and PassivHaus standards [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.