Project

Hartley Jam Factory

Repurposing and extending a landmark historic building

Part refurbishment, part new build, this project was an interesting blend of the past and present and created a living and working destination within a once forgotten landmark.

This extensive refurbishment and new build project breathed fresh life into a collection of iconic Edwardian buildings.

The client wanted to maintain the existing building, but extend upwards. After detailed historical and structural investigation we were able to establish that although there was some wear and tear, the original structure, foundations and cast-iron columns were in good condition and could accommodate up to three more storeys.

Additional floors were constructed as braced steel frames, with decking at separation floors and to minimise the extra weight on the structure we fitted timber floors in duplex units. Large cantilever projections were designed as two-storey high trusses.

In terms of enriching the existing structure, we were able to add new faƧades with large full height glazing and sections of copper cladding. We also refreshed the existing facades by adding bolt-on balconies and full height slot windows. To complete the job with a high-end finish we repaired and strengthened the masonry piers and the filler joist floors.

Client 
  • Angel Properties
Architect 
  • Ian Simpson Architects
Contractor 
  • Mansell plc
Completion Date2003

Please click on images below to open a full-screen gallery.

Explore Related Projects

Student Accommodation

Chapter London Bridge

Innovating city student living through MMC [...]

Read more

Residential

Synergy, Victoria Way

Read more

Residential

83 Barchester Street

Revitalising a site of industrial heritage for modern living and community-focused design [...]

Read more

Residential

Paddington Green Police Station

Wind-tunnel testing and temporary works design reduces high-rise concrete volumes & embodied carbon [...]

Read more

Mixed Use

Harold Hill Family Welcome Centre

Structural scheme designed for future-proof adaptation [...]

Read more

Healthcare

Springfield Hospital

Lean design delivers significant savings on time and materials [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.