Library of Birmingham

An award-winning, landmark public building

A new build library which is one of the largest public libraries in the world. It includes both adult and children libraries, offices, a multimedia centre, cafés and an exhibition hall alongside many other facilities.

This is an inspiring project where the merits of a post-tensioned concrete frame were chosen over a traditional steel approach, resulting in significant cost savings and a sophisticated, award winning structure.

Building a better library for Birmingham was a challenging and inspiring project. We worked closely with our clients Carillion and A.J. Morrisroe to bring to life the elegant designs of the architects.

Our approach was holistic. We began by appraising the whole scheme from first principles and pictured the structure in its entirety. After this review we suggested a post-tensioned concrete frame solution instead of the originally planned steel frame. By using this incredibly versatile form of construction we were able to make significant cost savings.

It also allowed us flexibility and greater control when building the complex structure, which included a two-storey high 10m cantilever and a 22m diameter central atrium with 28m long transfer walls. The library was constructed using 21,000m3 of concrete, and the frame is reinforced by 3,000 tonnes of steel.

At the end of the project the team had achieved an award winning structure and praise from Birmingham Council for our ingenuity, efficiency and delivery of best value.

Walsh won the PTA (Post-Tensioning Association) Building Award for this project and it was also shortlisted for a RIBA Stirling Prize for Architecture.

Awards

Client 
  • AJ Morrisroe
Architect 
  • Mecanoo
Contractor 
  • Carillion
Completion Date2013

Please click on images below to open a full-screen gallery.

Explore Related Projects

Build to Rent (BTR & PRS)

100 West Cromwell Road

Analysing foundation capacity and future-proofing structures [...]

Read more

Commercial

101 Newington Causeway

Identifying optimal approach for new sustainable commercial development [...]

Read more

Commercial

12 Westfield Avenue

Design for commercial planning application [...]

Read more

Commercial

127 Charing Cross Road

Extra storeys and a remodel whilst nightclub remained operational on ground floor [...]

Read more

Commercial

14 Westfield Avenue

Lightweight construction accelerates programme & reduces carbon [...]

Read more

Student Accommodation

2 Trafalgar Way

Largest Passivhaus PBSA project in Europe [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.