Project

Malt Street Regeneration

Innovative foundation and piling design to gain third-party approvals on complex, multiphase regeneration project

This multi-phase development poses challenges which required innovative foundation and piling design due to the location of existing and proposed National Grid tunnels. Walsh drew on its experience and expertise in designing buildings to be located over tunnels while working closely with Berkeley (South London) to obtain Approval in Principle for the development with National Grid.

Working with our geotechnical engineers we have minimised the extent of foundation, reduced the depths, removed or minimised transfers, and developed the design to mitigate difficult and expensive piling into the chalk. In doing so, were able to reduce the number of piles in stage 2 design by over 50% in certain areas.

Whilst being sympathetic to the architectural aspirations and MEP coordination, lean design was used to develop achievable plans for substructure and superstructure. This consisted on simplifying the stability elements of the buildings for ease of construction, reducing the volume of concrete and reducing the loads applied over the tunnels. Applying these lean design principles had the added benefit of further reducing the embodied carbon of the development.

Client 
  • Berkeley Homes
Architect 
  • Peter Taylor Associates
Completion Date2025
Malt Street Regeneration Tower
Malt Street Regeneration Birds Eye Sketch

Explore Related Projects

Build to Rent (BTR & PRS)

100 West Cromwell Road

Analysing foundation capacity and future-proofing structures [...]

Read more

Mixed Use

101 Camley Street

Tailoring a new-build for commercial, life sciences fit-out [...]

Read more

Commercial

101 Newington Causeway

Identifying optimal approach for new sustainable commercial development [...]

Read more

Commercial

12 Westfield Avenue

Design for commercial planning application [...]

Read more

Commercial

127 Charing Cross Road

Extra storeys and a remodel whilst nightclub remained operational on ground floor [...]

Read more

Commercial

14 Westfield Avenue

Lightweight construction accelerates programme & reduces carbon [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.