Midland Metro Hospital

Significant financial and carbon savings on hospital design

Walsh design managed to save several millions of pounds for the Sandwell and West Birmingham Hospitals NHS Trust, whilst creating a low-carbon solution which saved hundreds of tonnes of carbon as shown from Walshā€™s embodied carbon assessment.

This is a 10-storey hospital, with a total floor area covering 150,000m2 ā€“ the size of 21 football pitches.

Projects of this scale are rare and this project maximises the benefits of post-tensioning due to its inherent stiffness, reduced material quantities, structural depths and number of piles.

The savings are impressive, however the delivery of the project is just as important. The relationship throughout the project between Walsh, PSC, the design team and frame contractor were integral to the successful delivery of a project of this scale.

The savings and delivery made from adopting a PT solution on Midland Metropolitan Hospital sit proudly in Walshā€™s achievements in their longstanding history within post-tensioning.

Client 
  • PSC Limited
Architect 
  • Edward Williams
Contractor 
  • Carillion
  • Sandwell & West Birmingham Hospitals NHS Trust
Completion Date2024
Sectors 
Location 
  • Birmingham
  • Smethwick

Please click on images below to open a full-screen gallery.

Explore Related Projects

Student Accommodation

Wembley Park Plot NE01

Using lean design to reduce embodied carbon on large PBSA scheme [...]

Read more

Residential

Paddington Green Police Station

Wind-tunnel testing and temporary works design reduces high-rise concrete volumes & embodied carbon [...]

Read more

Hotels

Quay House

Integrated engineering approach delivers elegant & sustainable hotel design [...]

Read more

Mixed Use

Harold Hill Family Welcome Centre

Structural scheme designed for future-proof adaptation [...]

Read more

Student Accommodation

urbanest Battersea Palmerston Court

Exemplar PBSA development incorporating MMC innovations and PassivHaus standards [...]

Read more

Healthcare

Springfield Hospital

Lean design delivers significant savings on time and materials [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.