Millharbour Village

Minimised build cost through rationalisation

In addition to providing 1,500 new dwellings in a mix of units and tenures, this development will deliver two new schools, leisure facilities, retail and commercial space, a heavily landscaped public realm, and the associated infrastructure.

Walsh was engaged by Ballymore at an early stage to conduct a joint study with Glenn Howells to rationalise a consented scheme in order to minimise build costs. The optimised layouts that resulted from these studies included regularised footprints and centralised cores to maximise structural efficiency. Walsh also utilised outrigger walls and post-tensioned slabs to provide sufficiently robust structures with minimal material use.

A key challenge was posed by an existing trunk sewer that crossed the site. Walsh designed and obtained approval for the early division of this sewer, hence avoiding onerous build-over obligations for the client. These diversion works were completed in early 2020 ensuring a clear path for piling works to commence on programme in summer 2020.

Walsh have been appointed to deliver structural and civil engineering services for both phases of this project from RIBA Stage 1 through to completion, which is expected in 2026.

Client 
  • Ballymore
  • JV Partners
Architect 
  • Glenn Howells
Contractor 
  • JRL
Completion Date2026
Millharbour Village CGI
MIllharbour Village Model

Explore Related Projects

Student Accommodation

Chapter London Bridge

Innovating city student living through MMC [...]

Read more

Residential

Synergy, Victoria Way

Read more

Student Accommodation

Wembley Park Plot NE01

Using lean design to reduce embodied carbon on large PBSA scheme [...]

Read more

Residential

83 Barchester Street

Revitalising a site of industrial heritage for modern living and community-focused design [...]

Read more

Residential

Paddington Green Police Station

Wind-tunnel testing and temporary works design reduces high-rise concrete volumes & embodied carbon [...]

Read more

Hotels

Quay House

Integrated engineering approach delivers elegant & sustainable hotel design [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.