Project

Springfield Hospital

Lean design delivers significant savings on time and materials

Walsh were appointed as engineers on the Springfield Forensic and Non-Forensic buildings. These consist of two blocks of five storeys, approximately 110m by 75m on plan.

It is a mixed-use scheme consisting of hospital wards, car parking, plant and retail space. Together both blocks provide over 150 bedrooms and a wide array of treatment rooms, facilities and quiet garden spaces.

One block contains two large roof gardens protected by a series of cantilevering concrete piers with a high specification finish.

Walsh were able to derive a lean design to minimise slab depths while removing columns. We were able to remove a large amount of column heads and downstands, significantly simplifying the slab soffits.

One of the new blocks overhangs and existing building by up to 5.5m. Walsh were able to design a cantilevering shear wall system to achieve the offset and minimise the disruption to the existing building.

Ground conditions were also poor on the site and the garden buildups resulted in heavy building weights. Walsh worked with our geotechnical specialists to design a lean ground-bearing raft foundation for both buildings to support the heavy weight of the building.

Client 
  • South West London and St. George’s NHS Trust
Architect 
  • CF Moller
Contractor 
  • Sir Robert McAlpine
Completion Date2023

“Thank you for all your hard work. The level of service and support you and your team have given has been beyond that of any structural engineer I have worked with before. Your ability to engineer lean solutions and not simply over engineer everything has been second to none”

Alex Donnelly, Project Manager, Sir Robert McAlpine

Please click on images below to open a full-screen gallery.

Explore Related Projects

Build to Rent (BTR & PRS)

100 West Cromwell Road

Analysing foundation capacity and future-proofing structures [...]

Read more

Commercial

101 Newington Causeway

Identifying optimal approach for new sustainable commercial development [...]

Read more

Commercial

12 Westfield Avenue

Design for commercial planning application [...]

Read more

Commercial

127 Charing Cross Road

Extra storeys and a remodel whilst nightclub remained operational on ground floor [...]

Read more

Commercial

14 Westfield Avenue

Lightweight construction accelerates programme & reduces carbon [...]

Read more

Student Accommodation

2 Trafalgar Way

Largest Passivhaus PBSA project in Europe [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.